EXAMPLE SCENARIO · ENGINEERING

Reaching the market without tooling: a 1,500-unit pilot run.

EXAMPLE SCENARIOIoT startup·Product enclosure·1,500 units (illustrative)·ASA·10 days (illustrative)

The client

01 — WHO

A hardware startup developing a sensor device. This is a fictional scenario — not real client work. It is written to show how the decision to defer tooling actually plays out.

The need

02 — PROBLEM

The injection quote for the device enclosure: tooling plus six weeks. The market is not validated yet, and tooling freezes the design — if the first field feedback calls for a revision, a mould modification costs both money and calendar.

The solution

03 — PRODUCTION

The enclosure prints in ASA (for UV resistance) on the P2S fleet; heat-set inserts are fitted in the workshop. The first 200 units go to pilot customers; field feedback leads to revised ventilation channels — a file update, not a mould modification. The following 1,300 units print from the revised design.

ILLUSTRATIVE IMAGE — FICTIONAL SCENARIO, NO PRODUCTION PHOTO
FIG.01 IOT STARTUP · Illustrative image

By the numbers

04 — METRICS
1,500
UNITS (ILLUSTRATIVE)
10 days
FIRST DELIVERY
0
COST OF THE REVISION

What it shows

05 — OUTCOME

For hardware startups, R&D teams and anyone saying "let's sell first, tool later": tooling is a deferrable decision, and the product can be asked to prove its market first.

06 — QUOTE

Have a similar project?

Browse productsUpload a file